top of page
OIL EXPLORATION

Future Plans: To Become Productive and Self Reliant

SUMMARY: Possibilities exist to consult the archives of the NNPC concerning their geological and geophysical records. Based on the findings and information given, choices on area of exploration, research and seismic reflections will be made. The drilling platform will maintain, on a permanent basis, a team of three geologists and two geophysicists. Four drills of 3000 m capacity with 15 drillers will be required to work three times eight hours (3 x 8 hrs.) daily. The drilling exercise will continue for four years with 25 drills (oil wells) producing about 8000 barrels daily on the average. All equipment needed for the operations will be provided at the drilling sites. All escaping gas (H2S) and other decanter molecules will be introduced to the (appropriate recycling unit) for proper treatment procedures.

OCCUPATIONS NEEDED

No occupational listing posted yet. Please check later

Qualified candidates may send CVs and/or Resumes mailed to:

TONWEI™ Group of Companies

Human Resources Department

hr@tonweirefinery.com

Head Office

Contact Tonwei using smart contact:   tttango56@gmail.com

TONWEI Industrial Complex,

Atlantic Ocean Vertex,

Rivers Ramos / Dodo Island,

Ekeremor Local Government Area,

Bayelsa State – NIGERIA

  • Facebook Social Icon
  • Twitter Social Icon
  • Pinterest Social Icon
  • Google+ Social Icon

© 2021-2024 Tonwei Group Refineries. All rights reserved.                             Designed & Powered by T&T Web Designing    +1 510-240-2290

bottom of page