

TONWEI REFINERY | Molecular Science
Export Oriented Oil & Gas Refinery
OUR CONCEPTUAL STUDIES & BUSINESS PLANNING -
BACKGROUND NOTES

New Seaport Construction & Old Burutu Seaport Construction

SUMMARY: TONWEI™ plans to establish isobaths from the seashore to the seaside, with detailed land leveling of up to 2 km long. Access channel dredging of up to 6 m deep and 25 m large and removal of ballast at 200m on the land where the sand is dredged. Two dredgers with capacities of 14m deep and two drills with capacities of 3m diameters and 20m deep will be needed. Restoration of existing buildings, repairs & remarking of railway tracks for cranes, construction of warehouses, office buildings equipped with computers & telecommunication equipments, cold rooms, establishing a naval base for repairs of vessels and boats that will be equipped with workshops of specified techniques. TONWEI™ will establish a security organization in charge of dispositions for loading & off-loading of goods, items, passengers, etc.
Water Transportation Occupations
Ship Captains and Mates
Except Fishing Boats
Sailors and Deckhands
Marine Engineers
Bridge, Lock, and Lighthouse Tenders
Material Moving Equipment Operators
Supervisors
Material Moving Equipment Operators
Operating Engineers
Longshore Equipment Operators
Hoist and Winch Operators
Crane and Tower Operators
Excavating and Loading Machine Operators
Grader, Dozer, and Scraper Operators
Industrial Truck and Tractor Equipment Operators
Miscellaneous Material Moving Equipment Operators, N.E.C.
Qualified candidates may send CVs and/or Resumes mailed to:
TONWEI™ Group of Companies
Human Resources Department